| 01/11/2026 |
5 Sample Row |
ZZ99 9ZZ |
System... |
Stage changed to Assessment Completed |
Completed before Assessment took place existed; moved by migration 0047.
|
| 01/11/2026 |
4 Sample Row |
ZZ99 9ZZ |
System... |
Stage changed to Assessment Completed |
Completed before Assessment took place existed; moved by migration 0047.
|
| 01/11/2026 |
3 Example Close |
ZZ99 9ZZ |
System... |
Stage changed to Assessment Completed |
Completed before Assessment took place existed; moved by migration 0047.
|
| 01/11/2026 |
2 Example Close |
ZZ99 9ZZ |
System... |
Stage changed to Assessment Completed |
Completed before Assessment took place existed; moved by migration 0047.
|
| 31/10/2026 |
5 Sample Row |
ZZ99 9ZZ |
Developer |
PAS 2035 sign-off |
PIBI
|
| 31/10/2026 |
5 Sample Row |
ZZ99 9ZZ |
Developer |
PAS 2035 sign-off |
Design
|
| 31/10/2026 |
5 Sample Row |
ZZ99 9ZZ |
Developer |
Client decision recorded |
Design: Approved
|
| 31/10/2026 |
5 Sample Row |
ZZ99 9ZZ |
Developer |
Design document uploaded |
example-ventilation-strategy-5-sample-row.pdf
|
| 31/10/2026 |
5 Sample Row |
ZZ99 9ZZ |
Developer |
Design document uploaded |
example-design-drawings-5-sample-row.pdf
|
| 31/10/2026 |
5 Sample Row |
ZZ99 9ZZ |
Developer |
Design revision 1 created |
Pre-PIBI
|
| 31/10/2026 |
5 Sample Row |
ZZ99 9ZZ |
Developer |
PAS 2035 sign-off |
Modelling
|
| 31/10/2026 |
5 Sample Row |
ZZ99 9ZZ |
Developer |
MTP created |
Version 1
|
| 31/10/2026 |
5 Sample Row |
ZZ99 9ZZ |
Developer |
IOE created |
Version 1
|
| 31/10/2026 |
5 Sample Row |
ZZ99 9ZZ |
Developer |
IO created |
Version 1
|
| 31/10/2026 |
5 Sample Row |
ZZ99 9ZZ |
Developer |
Client decision recorded |
Modelling version 1: Approved
|
| 31/10/2026 |
5 Sample Row |
ZZ99 9ZZ |
Developer |
Modelling revision 1 issued |
|
| 31/10/2026 |
5 Sample Row |
ZZ99 9ZZ |
Developer |
Coordinator flagged |
More than three modelling versions.
|
| 31/10/2026 |
5 Sample Row |
ZZ99 9ZZ |
Developer |
Modelling revision 1 created |
|
| 31/10/2026 |
5 Sample Row |
ZZ99 9ZZ |
Developer |
Assessment completed |
|
| 31/10/2026 |
5 Sample Row |
ZZ99 9ZZ |
Developer |
Assessment booked with Eveco |
Booked for 27/10/2026 09:00. Reference PIBI.
|
| 31/10/2026 |
4 Sample Row |
ZZ99 9ZZ |
Developer |
PAS 2035 sign-off |
Design
|
| 31/10/2026 |
4 Sample Row |
ZZ99 9ZZ |
Developer |
Client decision recorded |
Design: Approved
|
| 31/10/2026 |
4 Sample Row |
ZZ99 9ZZ |
Developer |
Design document uploaded |
example-ventilation-strategy-4-sample-row.pdf
|
| 31/10/2026 |
4 Sample Row |
ZZ99 9ZZ |
Developer |
Design document uploaded |
example-design-drawings-4-sample-row.pdf
|
| 31/10/2026 |
4 Sample Row |
ZZ99 9ZZ |
Developer |
Design revision 1 created |
Pre-PIBI
|
| 31/10/2026 |
4 Sample Row |
ZZ99 9ZZ |
Developer |
PAS 2035 sign-off |
Modelling
|
| 31/10/2026 |
4 Sample Row |
ZZ99 9ZZ |
Developer |
MTP created |
Version 1
|
| 31/10/2026 |
4 Sample Row |
ZZ99 9ZZ |
Developer |
IOE created |
Version 1
|
| 31/10/2026 |
4 Sample Row |
ZZ99 9ZZ |
Developer |
IO created |
Version 1
|
| 31/10/2026 |
4 Sample Row |
ZZ99 9ZZ |
Developer |
Client decision recorded |
Modelling version 1: Approved
|
| 31/10/2026 |
4 Sample Row |
ZZ99 9ZZ |
Developer |
Modelling revision 1 issued |
|
| 31/10/2026 |
4 Sample Row |
ZZ99 9ZZ |
Developer |
Modelling revision 1 created |
|
| 31/10/2026 |
4 Sample Row |
ZZ99 9ZZ |
Developer |
Assessment completed |
|
| 31/10/2026 |
4 Sample Row |
ZZ99 9ZZ |
Developer |
Assessment booked with Eveco |
Booked for 27/10/2026 09:00. Reference PIBI.
|
| 31/10/2026 |
3 Example Close |
ZZ99 9ZZ |
Developer |
Client decision recorded |
Design: Changes Wanted
|
| 31/10/2026 |
3 Example Close |
ZZ99 9ZZ |
Developer |
Design document uploaded |
example-ventilation-strategy-3-example-close.pdf
|
| 31/10/2026 |
3 Example Close |
ZZ99 9ZZ |
Developer |
Design document uploaded |
example-design-drawings-3-example-close.pdf
|
| 31/10/2026 |
3 Example Close |
ZZ99 9ZZ |
Developer |
Design revision 1 created |
Pre-PIBI
|
| 31/10/2026 |
3 Example Close |
ZZ99 9ZZ |
Developer |
PAS 2035 sign-off |
Modelling
|
| 31/10/2026 |
3 Example Close |
ZZ99 9ZZ |
Developer |
MTP created |
Version 1
|
| 31/10/2026 |
3 Example Close |
ZZ99 9ZZ |
Developer |
IOE created |
Version 1
|
| 31/10/2026 |
3 Example Close |
ZZ99 9ZZ |
Developer |
IO created |
Version 1
|
| 31/10/2026 |
3 Example Close |
ZZ99 9ZZ |
Developer |
Client decision recorded |
Modelling version 1: Approved
|
| 31/10/2026 |
3 Example Close |
ZZ99 9ZZ |
Developer |
Modelling revision 1 issued |
|
| 31/10/2026 |
3 Example Close |
ZZ99 9ZZ |
Developer |
Modelling revision 1 created |
|
| 31/10/2026 |
3 Example Close |
ZZ99 9ZZ |
Developer |
Assessment completed |
|
| 31/10/2026 |
3 Example Close |
ZZ99 9ZZ |
Developer |
Assessment booked with Eveco |
Booked for 27/10/2026 09:00. Reference PIBI.
|
| 31/10/2026 |
2 Example Close |
ZZ99 9ZZ |
Developer |
MTP created |
Version 1
|
| 31/10/2026 |
2 Example Close |
ZZ99 9ZZ |
Developer |
IOE created |
Version 1
|
| 31/10/2026 |
2 Example Close |
ZZ99 9ZZ |
Developer |
IO created |
Version 1
|
| 31/10/2026 |
2 Example Close |
ZZ99 9ZZ |
Developer |
Client decision recorded |
Modelling version 1: Approved
|
| 31/10/2026 |
2 Example Close |
ZZ99 9ZZ |
Developer |
Modelling revision 1 issued |
|
| 31/10/2026 |
2 Example Close |
ZZ99 9ZZ |
Developer |
Modelling revision 1 created |
|
| 31/10/2026 |
2 Example Close |
ZZ99 9ZZ |
Developer |
Assessment completed |
|
| 31/10/2026 |
2 Example Close |
ZZ99 9ZZ |
Developer |
Assessment booked with Eveco |
Booked for 27/10/2026 09:00. Reference PIBI.
|
| 31/10/2026 |
14 Letchmore Road |
SG1 3PS |
Sam Rivers |
Photos uploaded |
test-photo-5.webp
|
| 31/10/2026 |
14 Letchmore Road |
SG1 3PS |
Sam Rivers |
Photos uploaded |
test-photo-4.heic
|
| 31/10/2026 |
14 Letchmore Road |
SG1 3PS |
Sam Rivers |
Photos uploaded |
test-photo-3.jpg
|
| 31/10/2026 |
14 Letchmore Road |
SG1 3PS |
Sam Rivers |
Photos uploaded |
test-photo-2.jpg
|
| 31/10/2026 |
14 Letchmore Road |
SG1 3PS |
Sam Rivers |
Photos uploaded |
test-photo-1.jpg
|
| 26/10/2026 |
Project |
— |
Developer |
Other contact changed: Morgan Hale... |
Organisation type: Was Client. Now Equans.
|
| 25/10/2026 |
Project |
— |
Developer |
Status changed |
Was Project Creation. Now In Delivery.
|
| 25/10/2026 |
Project |
— |
Developer |
Client Primary Contact Organisation changed |
Was Client. Now Equans.
|
| 24/10/2026 |
Project |
— |
Developer |
Measure Hierarchy changed |
Was Loft - 400mm; Cavity; Window and Doors; dMEV; ASHP/HWC; PV. Now Loft - 400mm; CWI E&R - Grey Bead; Window and Doors; dMEV; ASHP/HWC; PV.
|
| 24/10/2026 |
Project |
— |
Developer |
Measure added to list |
CWI E&R - Grey Bead
|
| 24/10/2026 |
Project |
— |
Developer |
Measure Hierarchy changed |
Was Loft; Cavity; Window and Doors; dMEV; ASHP/HWC; PV. Now Loft - 400mm; Cavity; Window and Doors; dMEV; ASHP/HWC; PV.
|
| 24/10/2026 |
Project |
— |
Developer |
Measure added to list |
Loft - 400mm
|
| 24/10/2026 |
Project |
— |
Developer |
Measure added to list |
LELs
|
| 24/10/2026 |
Project |
— |
Developer |
Measure Hierarchy changed |
Was Loft; Cavity; Window and Doors; dMEV; PV; ASHP/HWC. Now Loft; Cavity; Window and Doors; dMEV; ASHP/HWC; PV.
|
| 24/10/2026 |
Project |
— |
Developer |
Measure added to list |
EWI
|
| 24/10/2026 |
Project |
— |
Developer |
Staged set withdrawn: master_import_test.xlsx... |
|
| 24/10/2026 |
Project |
— |
Developer |
Key date confirmed: Phase 2 Start Date, 24 October 2026 |
Now 24 October 2026.
|
| 24/10/2026 |
Project |
— |
Developer |
Intended outcome changed |
Integrate EEMs (energy efficiency measures) with Other Improvements: Was Yes. Now No.
|
| 24/10/2026 |
Project |
— |
Developer |
Status changed |
Was Completed. Now Project Creation.
|
| 24/10/2026 |
Project |
— |
Developer |
Staged set brought back: master_import_test.xlsx... |
|
| 24/10/2026 |
Project |
— |
Developer |
Client Primary Contact Name changed |
Was Simon Waring. Now Simon Bob.
|
| 24/10/2026 |
Project |
— |
Developer |
Status changed |
Was In delivery. Now Completed.
|
| 23/10/2026 |
Project |
— |
Developer |
Intended outcome changed |
Reduce Energy Use: Was No. Now Yes.
|
| 23/10/2026 |
Project |
— |
Developer |
Reversed import erased |
Reason: Testing purposes; Properties: 3. Engagements kept: 3. Activity entries kept: 6. Staged rows blanked: 2.
|
| 23/10/2026 |
Project |
— |
Developer |
Import reversed: master_import_test.xlsx... |
Omitted
|
| 23/10/2026 |
Erased property |
— |
Developer |
Import reversed: Omitted |
|
| 23/10/2026 |
Erased property |
— |
Developer |
Import reversed: Omitted |
|
| 23/10/2026 |
Erased property |
— |
Developer |
Import reversed: Omitted |
|
| 23/10/2026 |
Project |
— |
Developer |
Measure Hierarchy changed |
Was Cavity; Loft; Window and Doors; dMEV; PV; ASHP/HWC. Now Loft; Cavity; Window and Doors; dMEV; PV; ASHP/HWC.
|
| 23/10/2026 |
Project |
— |
Developer |
Measure Hierarchy changed |
Was Cavity; Loft; Window and Doors; dMEV; PV. Now Cavity; Loft; Window and Doors; dMEV; PV; ASHP/HWC.
|
| 23/10/2026 |
Project |
— |
System... |
Intended Outcomes changed |
Was Integrate EEMs (energy efficiency measures) with Other Improvements; Lower space-heating demand in the treated homes; Reduce the risk of damp and mould by pairing fabric work with ventilation; Improve winter comfort for tenants; Move eligible homes towards EPC band C where this hierarchy can achieve it. Now Integrate EEMs (energy efficiency measures) with Other Improvements.
|
| 22/10/2026 |
Project |
— |
Developer |
Key date confirmed: Phase 1 End Date, 1 January 2027 |
Now 1 January 2027.
|
| 22/10/2026 |
Project |
— |
Developer |
Key date confirmed: Phase 1 Start Date, 1 October 2026 |
Now 1 October 2026.
|
| 22/10/2026 |
Project |
— |
Developer |
Key date confirmed: Contract End Date, 25 March 2027 |
Now 25 March 2027.
|
| 22/10/2026 |
Project |
— |
Developer |
Measure added to list |
FRI
|
| 22/10/2026 |
Project |
— |
Developer |
Funding Scheme changed |
Was None recorded. Now WH:SHF Wave 3.
|
| 22/10/2026 |
Project |
— |
Developer |
Equans Primary Contact Email changed |
Was None recorded. Now simon.waring@equans.com.
|
| 22/10/2026 |
Project |
— |
Developer |
Equans Primary Contact Phone changed |
Was None recorded. Now 07860682305.
|
| 22/10/2026 |
Project |
— |
Developer |
Equans Primary Contact Name changed |
Was None recorded. Now Simon Waring.
|
| 22/10/2026 |
Project |
— |
Developer |
Client Primary Contact Email changed |
Was None recorded. Now psionw35@gmail.com.
|
| 22/10/2026 |
Project |
— |
Developer |
Client Primary Contact Phone changed |
Was None recorded. Now 07860682305.
|
| 22/10/2026 |
Project |
— |
Developer |
Client Primary Contact Name changed |
Was None recorded. Now Simon Waring.
|
| 22/10/2026 |
Project |
— |
Developer |
Status changed |
Was Completed. Now In delivery.
|
| 22/10/2026 |
Project |
— |
Developer |
Other contact added: Ivy Fenwick... |
|
| 22/10/2026 |
Project |
— |
Developer |
Other contact added: Tom Achterberg... |
|
| 22/10/2026 |
Project |
— |
Developer |
Other contact added: Priya Nandra... |
|
| 22/10/2026 |
Project |
— |
Developer |
Other contact added: Morgan Hale... |
|
| 22/10/2026 |
Project |
— |
System... |
Measure Hierarchy changed |
Was Cavity; Loft; Window and Doors; dMEV; PV; Loft insulation, top up to 300 mm; Cavity wall insulation where cavities are unfilled; Ventilation where the fabric is improved; Heating controls, including a programmer, a room thermostat, and thermostatic radiator valves. Now Cavity; Loft; Window and Doors; dMEV; PV.
|
| 22/10/2026 |
Erased property |
— |
Developer |
Engagement opened |
Master record created from upload.
|
| 22/10/2026 |
Erased property |
— |
Developer |
Engagement opened |
Master record created from upload.
|
| 22/10/2026 |
Erased property |
— |
Developer |
Engagement opened |
Master record created from upload.
|
| 22/10/2026 |
Project |
— |
Developer |
Status changed |
Was In delivery. Now Completed.
|
| 22/10/2026 |
Project |
— |
Developer |
Equans Contract Number changed |
Was None recorded. Now JR00117.
|
| 22/10/2026 |
Project |
— |
Super User |
Intended outcome changed |
Integrate EEMs (energy efficiency measures) with Other Improvements: Was No. Now Yes.
|
| 22/10/2026 |
Project |
— |
Developer |
Measure Hierarchy changed |
Was Loft insulation, top up to 300 mm; Cavity wall insulation where cavities are unfilled; Ventilation where the fabric is improved; Heating controls, including a programmer, a room thermostat, and thermostatic radiator valves. Now Cavity; Loft; Window and Doors; dMEV; PV; Loft insulation, top up to 300 mm; Cavity wall insulation where cavities are unfilled; Ventilation where the fabric is improved; Heating controls, including a programmer, a room thermostat, and thermostatic radiator valves.
|
| 22/10/2026 |
Project |
— |
Developer |
Key date confirmed: Contract Start Date, 1 October 2026 |
Now 1 October 2026.
|
| 22/10/2026 |
Project |
— |
Developer |
Primary RC set: Coordinator |
|
| 22/10/2026 |
Project |
— |
Developer |
Access given to Coordinator... |
|
| 22/10/2026 |
Project |
— |
Developer |
Project saved: Intended outcomes |
|
| 18/10/2026 |
14 Letchmore Road |
SG1 3PS |
Developer |
Developer check |
Added from the property page pop-up during verification.
|
| 18/10/2026 |
14 Letchmore Road |
SG1 3PS |
Developer |
Secondary Number changed |
Was empty. Now 07985 625786.
|
| 18/10/2026 |
14 Letchmore Road |
SG1 3PS |
Developer |
Title changed |
Was empty. Now Mrs.
|
| 18/10/2026 |
14 Letchmore Road |
SG1 3PS |
Developer |
Spoke with tenant about arranging access |
Call back on 28/10/2026.
|
| 18/10/2026 |
14 Letchmore Road |
SG1 3PS |
Developer |
Call back |
Call back on the 28/10/2026
|
| 18/10/2026 |
14 Letchmore Road |
SG1 3PS |
Ruth Ellison |
Secondary Number changed |
Was 07700 900214. Now empty.
|
| 18/10/2026 |
14 Letchmore Road |
SG1 3PS |
Developer |
Stage changed |
Assessment booked.
|
| 15/10/2026 |
1 Example Close |
ZZ99 9ZZ |
Developer |
Property hidden: Omitted |
|
| 15/10/2026 |
12 Imaginary Gardens |
ZZ99 9ZZ |
Developer |
Engagement opened |
Master record created from upload.
|
| 15/10/2026 |
11 Madeup Mews |
ZZ99 9ZZ |
Developer |
Engagement opened |
Master record created from upload.
|
| 15/10/2026 |
10 Madeup Mews |
ZZ99 9ZZ |
Developer |
Engagement opened |
Master record created from upload.
|
| 15/10/2026 |
9 Pretend Lane |
ZZ99 9ZZ |
Developer |
Engagement opened |
Master record created from upload.
|
| 15/10/2026 |
8 Pretend Lane |
ZZ99 9ZZ |
Developer |
Engagement opened |
Master record created from upload.
|
| 15/10/2026 |
7 Fictional Way |
ZZ99 9ZZ |
Developer |
Engagement opened |
Master record created from upload.
|
| 15/10/2026 |
6 Fictional Way |
ZZ99 9ZZ |
Developer |
Engagement opened |
Master record created from upload.
|
| 15/10/2026 |
5 Sample Row |
ZZ99 9ZZ |
Developer |
Engagement opened |
Master record created from upload.
|
| 15/10/2026 |
4 Sample Row |
ZZ99 9ZZ |
Developer |
Engagement opened |
Master record created from upload.
|
| 15/10/2026 |
3 Example Close |
ZZ99 9ZZ |
Developer |
Engagement opened |
Master record created from upload.
|
| 15/10/2026 |
2 Example Close |
ZZ99 9ZZ |
Developer |
Engagement opened |
Master record created from upload.
|
| 15/10/2026 |
1 Example Close |
ZZ99 9ZZ |
Developer |
Engagement opened |
Master record created from upload.
|
| 08/10/2026 |
9 Shephall Way |
SG2 9GH |
Ruth Ellison |
Case note |
Assessor paperwork is still with the coordinator.
|
| 08/10/2026 |
9 Shephall Way |
SG2 9GH |
Daniel Brooks |
Assessment booked |
Tenant confirmed they will be in. Use the front door.
|
| 08/10/2026 |
9 Shephall Way |
SG2 9GH |
Daniel Brooks |
Telephone call |
Spoke with Amina. She can do 14 October in the morning.
|
| 08/10/2026 |
27 Fairlands Way |
SG2 8AB |
Ruth Ellison |
Case note |
Benefit check still outstanding.
|
| 07/10/2026 |
27 Fairlands Way |
SG2 8AB |
Daniel Brooks |
Booking offered |
Offered 15 October in the morning. No date agreed.
|
| 07/10/2026 |
27 Fairlands Way |
SG2 8AB |
Daniel Brooks |
Telephone call |
Joseph asked for a call on 12 October after work.
|
| 06/10/2026 |
27 Fairlands Way |
SG2 8AB |
Daniel Brooks |
Telephone call |
Tried the mobile. Left no message.
|
| 05/10/2026 |
27 Fairlands Way |
SG2 8AB |
Ruth Ellison |
Engagement opened |
Master record created from upload.
|
| 03/10/2026 |
9 Shephall Way |
SG2 9GH |
Daniel Brooks |
First-contact letter |
FIRST CONTACT LETTER 3 October 2026 Amina Rahman 9 Shephall Way Stevenage Hertfordshire SG2 9GH Dear Amina Rahman, We are writing to you about your home at 9 Shephall Way, Stevenage, Hertfordshire, SG2 9GH. The home is included in Stevenage BC Wave 3. We would like to arrange a time to speak with you about an assessment of the property. Please contact the resident liaison officer, or wait for our telephone call. Yours sincerely Resident liaison officer Stevenage BC Wave 3
|
| 03/10/2026 |
9 Shephall Way |
SG2 9GH |
Ruth Ellison |
Engagement opened |
Master record created from upload.
|
| 02/10/2026 |
14 Letchmore Road |
SG1 3PS |
Ruth Ellison |
Engagement opened |
Master record created from upload.
|