Test data only. Do not enter real personal data until logins are live.

Design

3 Example Close, ZZ99 9ZZ

Back to property

Pre-PIBI

Revision 1

Current Issued to Designer

From modelling revision 1

Issued 29/10/2026 by Developer

Designer: Rowan Example

Data sufficiency: Not recorded

Measures

  • Loft Included

    Modelling line: Loft

Documents

  • example-design-drawings-3-example-close.pdf Design Drawings

    Uploaded by Developer on 31/10/2026 at 18:18

    78 bytes

  • example-ventilation-strategy-3-example-close.pdf Ventilation Strategy

    Uploaded by Developer on 31/10/2026 at 18:18

    78 bytes

Notes

No notes.

Design review

No design review.

Post-PIBI

No design revision yet.

New revision

A new revision of a phase replaces the current one. The modelling revision and each modelling line stay the same. A reason is required from revision 2.

Design Revision

Client decision

  • Changes Wanted 31/10/2026 at 18:18 by Developer Proof: example-client-changes-form-3-example-close.pdf (signed form)
    • example-design-drawings-3-example-close.pdf
    • example-ventilation-strategy-3-example-close.pdf

Record decision

Uploads on record

PAS 2035 sign-off

Phase: Design

  • PAS 2035 sign-off for Modelling at 31/10/2026 at 18:18 by Developer

PAS 2035 sign-off stays locked until the newest revision of every document in the pack is approved.