BMSDC Wave 3

Status: On Hold, step 2 of 3
Details
Client Name
Babergh & Mid Suffolk District Council
Project Name
BMSDC Wave 3
Funding Scheme
WH:SHF Wave 3
Equans Contract Number
JR00117
Primary RC
Status
On Hold

Edit Details

Contact Details

Client Primary Contact

Name
Simon John
Phone
07860682306
Email
psionw35@gmail.com

Equans Primary Contact

Name
Simon Waring
Phone
07860682305
Email
psionw35@gmail.com
Equans (1)
Name
Mr Simon Waring
Job Title
Boss
Phone
07860682305
Email
psionw35@gmail.com
Import
Date File By Status
22/10/2026 at 18:25 master_import_test.csv Developer Reversed 22/10/2026 at 18:37
22/10/2026 at 18:25 master_import_test.csv Developer Staged
Key Dates
Contract Start Date
24/10/2026
Contract End Date
30/11/2026
Phase 1 Start Date
26/10/2026
Phase 1 End Date
30/11/2026
Assessor Companies
  • Eveco
Intended Outcomes
Reduce Energy Use
Reduce Energy Costs
Reduce Emissions
Improve Internal Comfort
Improve IAQ (indoor air quality)
Eliminate Damp/Condensation/Mould
Reduce Overheating Risk
Improve Energy Rating
Meets Performance Standard
Improve Usefulness or Sustainability of Building
Protects Building Against Decay
Improve Management of Moisture
Resilience to Flood / Resistance Water Penetration
Improve Resilience to Climate Change
Protects Architectural Heritage
Integrate EEMs (energy efficiency measures) with Other Improvements
Measure Hierarchy
Measure 1.
Loft
Measure 2.
Cavity
Measure 3.
Window and Doors
Measure 4.
dMEV
Measure 5.
ASHP/HWC
Measure 6.
PV
Properties

No properties yet.

Activity
Date Address Postcode User Action Notes
14/11/2026 Project — Developer Assessor company added Eveco
25/10/2026 Project — Developer Key date confirmed: Phase 1 End Date, 30 November 2026 Now 30 November 2026.
25/10/2026 Project — Developer Key date confirmed: Phase 1 Start Date, 26 October 2026 Now 26 October 2026.
25/10/2026 Project — Developer Status changed Was In Delivery. Now On Hold.
25/10/2026 Project — Developer Status changed Was On Hold. Now In Delivery.
25/10/2026 Project — Developer Status changed Was Completed. Now On Hold.
25/10/2026 Project — Developer Status changed Was On Hold. Now Completed.
25/10/2026 Project — Developer Measure Hierarchy changed Was Loft; Cavity; ASHP/HWC; Window and Doors; dMEV; PV; FRI. Now Loft; Cavity; Window and Doors; dMEV; ASHP/HWC; PV.
25/10/2026 Project — Developer Measure Hierarchy changed Was Loft; Cavity; Window and Doors; dMEV; ASHP/HWC; PV. Now Loft; Cavity; ASHP/HWC; Window and Doors; dMEV; PV; FRI.
25/10/2026 Project — Developer Measure added to list FRI
25/10/2026 Project — Developer Status changed Was In delivery. Now On Hold.
24/10/2026 Project — Developer Status changed Was Completed. Now In delivery.
24/10/2026 Project — Developer Other contact added: Mr Simon Waring
24/10/2026 Project — Developer Measure Hierarchy changed Was None recorded. Now Loft; Cavity; Window and Doors; dMEV; ASHP/HWC; PV.
24/10/2026 Project — Developer Key date confirmed: Contract End Date, 30 November 2026 Now 30 November 2026.
24/10/2026 Project — Developer Key date confirmed: Contract Start Date, 24 October 2026 Now 24 October 2026.
24/10/2026 Project — Developer Status changed Was In delivery. Now Completed.
24/10/2026 Project — Developer Client Primary Contact Name changed Was Simon Waring. Now Simon John.
24/10/2026 Project — Developer Client Primary Contact Phone changed Was 07860682305. Now 07860682306.
23/10/2026 Project — Developer Status changed Was Project Creation. Now In delivery.
23/10/2026 Project — Developer Status changed Was Completed. Now Project Creation.
23/10/2026 Project — Developer Status changed Was Project Creation. Now Completed.
23/10/2026 Project — Developer Status changed Was In delivery. Now Project Creation.
23/10/2026 Project — Developer Status changed Was Project Creation. Now In delivery.
22/10/2026 Project — Developer Import reversed: master_import_test.csv... Testing purposes
22/10/2026 3 Fiction Lane ZZ99 1AC Developer Import reversed: Testing purposes
22/10/2026 2 Fiction Lane ZZ99 1AB Developer Import reversed: Testing purposes
22/10/2026 1 Fiction Lane ZZ99 1AA Developer Import reversed: Testing purposes
22/10/2026 Project — Developer Staged set brought back: master_import_test.csv...
22/10/2026 Project — Developer Staged set withdrawn: master_import_test.csv...
22/10/2026 3 Fiction Lane ZZ99 1AC Developer Engagement opened Master record created from upload.
22/10/2026 2 Fiction Lane ZZ99 1AB Developer Engagement opened Master record created from upload.
22/10/2026 1 Fiction Lane ZZ99 1AA Developer Engagement opened Master record created from upload.
22/10/2026 Project — Developer Access given to Martin Hale...
22/10/2026 Project — Developer Access given to Chris Lang...
22/10/2026 Project — Ruth Ellison Access given to Daniel Brooks...
22/10/2026 Project — Ruth Ellison Primary RC set: Coordinator
22/10/2026 Project — Developer Project created

Activity Entry

Date
14/11/2026
Property
Project
Postcode
—
User
Developer
Action
Assessor company added
Notes
Eveco

A correction is a new log entry. The original entry is not changed.

Import Details

master_import_test.csv, 22/10/2026 at 18:25, imported by Developer. Reversed 22/10/2026 at 18:37

Batch 2, master_import_test.csv, 22/10/2026 at 18:25. Reversed 22/10/2026 at 18:37

Staged Import

master_import_test.csv, 22/10/2026 at 18:25, staged by Developer

Add Contact

Edit Contacts

Contacts
Name Company Role/Job title Phone Email
Client (Primary) Primary contact 07860682306 psionw35@gmail.com
Equans (Primary) Primary contact 07860682305 psionw35@gmail.com
Equans Boss 07860682305 psionw35@gmail.com

Measure Hierarchy

The order chosen here is the display order.

  1. Measure 1. Loft
  2. Measure 2. Cavity
  3. Measure 3. Window and Doors
  4. Measure 4. dMEV
  5. Measure 5. ASHP/HWC
  6. Measure 6. PV

Intended Outcomes

Reduce Energy Use
Reduce Energy Costs
Reduce Emissions
Improve Internal Comfort
Improve IAQ (indoor air quality)
Eliminate Damp/Condensation/Mould
Reduce Overheating Risk
Improve Energy Rating
Meets Performance Standard
Improve Usefulness or Sustainability of Building
Protects Building Against Decay
Improve Management of Moisture
Resilience to Flood / Resistance Water Penetration
Improve Resilience to Climate Change
Protects Architectural Heritage
Integrate EEMs (energy efficiency measures) with Other Improvements

Contact Details

Primary RC contact details
Name Company Role/Job title Phone Email
Sam Rivers Equans Retrofit Coordinator

Erase Reversed Import

This replaces the address and tenant details on the properties this reversed import created with Erased, and takes those properties off the lists. Staged rows from that same file are cleared as well: personal fields are replaced with Erased, and that staged set is withdrawn if it was still open. Activity already recorded stays, and the property is shown as Erased property. You cannot bring this batch back.

Do not put personal data (names, addresses, phone numbers or emails) in the reason.

Add Assessor Company

Assessor Companies

Companies already linked are not shown.

Remove Assessor Company

Assessor Company Eveco

Existing bookings with this company are not affected.

Key Dates

Contract Start Date
24/10/2026
Contract End Date
30/11/2026
Phase 1 Start Date
26/10/2026
Phase 1 End Date
30/11/2026