Test data only. Do not enter real personal data until logins are live.

3 Example Close

DEMO-03

Assessment Completed

Working record for Jo Placeholder, 3 Example Close.

You can see the full record.

Opened 15/10/2026 at 16:35.

Property 3 Example Close
Project
Stevenage BC Wave 3
System ID
DEMO-03
Date Added
01/09/2026
UPRN
990000000102
Address
3 Example Close
Demo Estate
Exampletown
Postcode
ZZ99 9ZZ
Tenant Name
Jo Placeholder
Primary Number
07700 900103
Secondary Number
Email
tenant3@example.com
Current Stage
Assessment Completed
Overall Status
Active

No assessment is booked.

Activity
Date Address User Action Notes
01/11/2026 3 Example Close System... Stage changed to Assessment Completed Completed before Assessment took place existed; moved by migration 0047.
31/10/2026 3 Example Close Developer Client decision recorded Design: Changes Wanted
31/10/2026 3 Example Close Developer Design document uploaded example-ventilation-strategy-3-example-close.pdf
31/10/2026 3 Example Close Developer Design document uploaded example-design-drawings-3-example-close.pdf
31/10/2026 3 Example Close Developer Design revision 1 created Pre-PIBI
Show Activities

New Activity

Activity Entry

Date
01/11/2026
Property
3 Example Close
Postcode
ZZ99 9ZZ
User
System (Issue #347 migration)
Action
Stage changed to Assessment Completed
Notes
Completed before Assessment took place existed; moved by migration 0047.

A correction is a new log entry. The original entry is not changed.

First-Contact Letter

Generate a letter from the first-contact template. It uses the tenant name and address.

Generate Letter

Tasks

A task has a due date and an assignee.

No tasks yet.

Key Dates

None yet.

Select the type, then the date. Locked after confirm. Super User, Retrofit Manager and Developer can change a confirmed key date.

Key Dates

Book Assessment

Booking an assessment puts the visit on the calendar and sets the stage to Assessments Booked. Do not put special notes here.